|
|
V - Lock System |
Scaffold Systems are tested and conforms in accordance with the requirements of British Standard BS EN 12 (part two) . Facade scaffolds made from prefabricated components. BS EN 12811-1:2003(part one) .BS EN 1(part three) Temporary Works Equipment, Scaffolds,
Standard 6'6" Effective scaffolding length 6'6"(1.981m)
Standard 9'9" Effective scaffolding length 9'9"(2.972m)
These standards from the vertical support or uprights. They are made from high tensile tube. A series of "V" pressings are the means of attachment for the transom unit and the guardrail.
Transom / Ledgers (also usde
as guardrail) / Toe board Brackets
End Toe Board Brackets / Batten Clamps / One Board Stage Brackets
Two Board Brackets / K - Stage Hop Up Brackets 1 bed, 2 brd, 3 brd,
Steelstage 8' / Steelstage 6' / Steelstage 4'2" / Adjustable Basejacks / Ladder |
|
|
Size (M) |
3.0 |
2.0 |
1.0 |
Weight (Kg.) |
17.25 |
11.70 |
6.25 |
|
|
|
|
|
|
Size (M) |
2.4 |
1.2 |
|
Weight (Kg.) |
7.10 |
3.55 |
|
|
|
|
|
|
|
Size (M) |
0.8 |
1.2 |
|
Weight (Kg.) |
5.70 |
9.66 |
|
|
|
|
|
|
|
Size (M) |
2.4 |
1.8 |
|
Weight (Kg.) |
9.25 |
7.10 |
|
|
|
|
|
|
|
Size (M) |
2.74 |
3.54 |
|
Weight (Kg.) |
10.90 |
13.10 |
|
|
|
|
|
|